Bali Refuse Incineration Plant
:::
  Description of Flow Diagram
(from left to right)
  1. Town & city refuse collected by dumper trucks --> Refuse weights taken by weighbridge --> Arriving the refuse dumping area --> Dumping the refuse into refuse bunker.
  2. Crane operator at control station operates the crane to dump the refuse into incinerator for incineration --> Boiler generating steam to drive turbine generator.
  3. Ashes and slags formed as result of incineration becoming stable for disposal --> Ashes and slags are moved via conveyors into ash pits for storage before disposal.
  4. Flue gas generated by refuse burning --> Flue gas is treated by flue gas treatment plant --> Gases of components complying the emission standard are emitted into the funnel entrance --> Treated gases are emitted into open air at an elevation of 150 meters through a funnel.
Description of Flow Diagram
:::