Bali Refuse Incineration Plant
:::
  Company History

The whole plant structures are designed with exterior walls of aluminum-framed glass-panel construction. The funnel stands 150 meters in height. The plant building was designed by a teamwork led by I.M. Pei, an architect with high renowns in USA.

Company History

Featured hill-shape skylights of exhibition hall, and asymmetric hill-shape arc skylights of dumping area constitute as major scenic prospects represented by the glass-panel wall of plant buildings.

Company History

Refuse dumping area is located at east side of this plant, with elevation of 13 meters. Dumping trucks are arranged to get access to the dumping area en route of an elevated driveway leading to dumping gates.

:::